Bass Oil Limited (ASX:BAS) is an Australian-listed oil producer that holds a majority interest in eight permits in the Cooper Basin including the 100%
owned Worrior and Padulla oil fields and a 55% interest in a South Sumatra Basin KSO. The Company is debt free and committed to creating value
by leveraging the competitive strengths of its team, operating capability, reputation, and relationships in both Australia and Indonesia.
Highlights
• Total sales revenue for February was US$391,129 net to Bass (A$629,432)
• Daily oil production for the group averaged 239 bopd for the month and total monthly
production was 6,700 barrels
• Total Cooper Basin monthly production was 2,971 barrels produced and 2,188 barrels sold
at an average oil price of A$119.22 per barrel
• Total Indonesian oil production was 3,729 barrels net to Bass with 3,798 barrels sold at an
average oil price of US$72.39 per barrel
• Condensate produced during the Kiwi test sold, realising A$59,000 in revenue received in
March
Monthly Production and Sales:
Bass Oil Monthly Production (kbbl)
12
Production (kbbl)
10
3.16
8
6
3.03
2.95
3.07
2.93
3.02
4
2
3.01
3.33
7.96
4.41
4.64
4.71
4.92
5.91
2.87
3.44
3.66
4.20
4.21
3.98
2.97
6.72
5.22
3.73
0
Indonesian Production
Cooper Basin Production
Daily oil production for the group averaged 239 bopd (Bass share) in February. Monthly production totaled
6,700 barrels (Bass share) with monthly sales of 5,986 barrels. Total sales revenue for February was
US$391,129 (or A$629,432) net to Bass. See below for further information.
Bass Oil Limited
ACN: 008 694 817
Level 5, 11-19 Bank Pl.,
Melbourne 3000
Victoria, Australia
T + 61 3 9927 3000
F + 61 3 9614 6533
admin@bassoil.com.au
www.bassoil.com.au
Cooper Basin Operations
Production from the Company’s 100% owned Worrior and Padulla oilfields was 2,971 barrels for the month
of February. Oil sales totaled 2,188 barrels for the month, down 3.7% on January. Production averaged
106 bopd in February.
The Company achieved an average sales price of A$119.22 per barrel for oil sales. Cash receipts for oil sales
are expected before month end.
Production Operations
The Worrior and Padulla facilities recorded uptimes of 97% and 99% respectively for February. Production
was down 3.5% in February following the failure of the engine on the second HPS unit at Worrior. The unit
has been sent for repairs. Worrior is now operating with one HPS unit online.
Gas Appraisal
Kiwi 1 Field Development (Bass 100%)
During the month Bass announced that it had sold 718 barrels of condensate produced during the
production test. The sale realised A$59,000 of revenue that was received in March.
Discussions with the Cooper Basin Joint Venture continue for the transportation and processing of gas and
gas liquids to be produced from the Kiwi field. Potential gas buyers continue to show interest.
The Company is evaluating proposals for the Front End Engineering Design (FEED) studies to finalise the
scope and cost estimates for the field development.
Figure 1: Map of Bass’ Kiwi Gas Field – Northern Cooper Basin Triassic Gas and Oil Play
2
PEL 182 Deep Coal Commercialisation Study – Phase 2 (Bass 100%)
Bass and SLB have finalised the scope of phase 2 of the study which SLB will lead. The results of the study
are due in the second half of CY25. The objective phase 2 is to utilise the MEM built during phase 1 to
determine preliminary well designs and the number of frac stages required to achieve flow rates and gas
recoveries per well to economically exploit this substantial resource.
Indonesian Operations
Production from the Company’s Tangai-Sukananti Oil fields in Indonesia averaged 133 bopd (Bass share) in
February up 4% on January. Bass share of field production for the month was 3,729 barrels of oil with
3,798 barrels of oil sold. The average monthly oil price for February was US$72.39 per barrel.
Development
As previously reported drilling rig availability has delayed the drilling of the Bunian 6 development well.
Discussions with Pertamina EP with a view to securing a rig slot on their drilling program are in progress. As
part of those discussions the team is looking to lock in a spud date as soon as possible.
The well pad construction has been completed with the flowline laid to the edge of the location.
Figure 2: Bunian 6 Well pad
This announcement has been authorised for release by the Board of Directors of Bass Oil Limited.
For further information please contact:
Tino Guglielmo
Managing Director
Bass Oil Limited
Ph: +61 3 9927 3000
Email: tino.guglielmo@bassoil.com.au
3
4
Share your feedback
Discover