Operations Update – December
Bass Oil Limited (ASX:BAS) is an Australian-listed oil producer that holds a majority interest in eight permits in the Cooper Basin including the 100%
owned Worrior and Padulla oil fields and a 55% interest in an Indonesian KSO. Bass is debt free and committed to creating shareholder value
Highlights
• Total sales revenue for December was A$546,277 net to Bass
• Daily oil production for the group averaged 239 bopd for the month, with total monthly
production of 7,407 barrels
• Total Cooper Basin monthly production was 2,717 barrels with 2,328 barrels sold at an
average oil price of A$94.02 per barrel
• Total Indonesian oil production was 4,690 barrels net to Bass, with 4,732 barrels sold at an
average oil price of US$60.05 per barrel
• Bass signed binding gas sales agreement with Origin Energy for Vanessa gas starting in 2026
• Vanessa acquisition - regulatory approval progressing and expected shortly
• The Triassic gas play study yields encouraging results
Monthly Production and Sales:
Daily oil production for the group averaged 239 bopd (Bass share) in December. Monthly production totaled
7,407 barrels (Bass share) with monthly sales of 7,060 barrels. Total sales revenue for December was
A$546,277 net to Bass. See below for further information.
3.98 3.73 4.01 4.15 4.21 4.22 4.10 4.01 4.24
4.78 4.93 4.69
3.66
2.97 2.86 2.62 2.97 3.00
2.72 3.05 2.79
2.78 2.55 2.72
0
1
2
3
4
5
6
7
8
9
Production
(kbbl)
Bass Oil Monthly Production (kbbl)
Indonesian Production Cooper Basin Production
ASX Announcement
2
Cooper Basin Operations
Production from the Company’s 100% owned Worrior and Padulla oilfields was 2,717 barrels for December,
averaging 88 bopd, up 3.1% on November. Oil sales totaled 2,328 barrels for the month. The Company
achieved an average oil sales price of A$94.02 per barrel.
Production Operations
The Worrior and Padulla facilities recorded uptimes of 99% for December. The Padulla 3 jet pump was
retrieved and replaced mid-month resulting an increase in production as expected.
Gas Appraisal
Vanessa Gas Field (Bass acquiring 100%)
On 7 December Bass executed a binding three-year Gas Sales Agreement with Origin Energy for the purchase
of all gas produced from the facility, to a total of 12 PJ, from the re-start of the Vanessa field. Bass is also close
to securing the relevant regulatory approvals for the transaction.
The Vanessa gas field acquisition (Figure 1) includes a gas processing facility and a 5-kilometre pipeline
connecting to the Cooper Basin gas pipeline network. Detailed planning for the certification and
recommissioning of the Vanessa well, facilities and pipeline has commenced. The Vanessa acquisition is
important to the Company as it provides the opportunity for:
• First gas sales - Recommissioning of the Vanessa gas production facility and pipeline will enable the
Company’s first gas sales into the east coast gas market in the second half 2026.
• Reserve growth - By proving up the untested conventional and tight gas potential in the Toolachee
and Patchawarra formations. These can be accessed in the existing well by fracture stimulation.
• Advancement of activities to commercialise the deep coals - The Vanessa well penetrated the entire
Permian sequence of sediments, including the deep coals. This location is ideally located to test the
potential of the large deep coal resource in PEL 182 without the cost burden of drilling a well.
Figure 1: Map of Bass permit PEL 182 displaying Vanessa gas field
3
PEL 182 Deep Coal Commercialisation Study – Phase 2 (Bass 100%)
The scope of phase 2 of the study which SLB will lead, has been finalised. The study will focus on well and
fracture stimulation design for economic exploitation of this significant resource utilising the Vanessa well
and will commence following completion of the acquisition.
The Santos led Cooper Basin JV is continuing efforts to commercialize this resource. Santos is planning to drill
two wells in this 12-month period to trial the use of high angle/horizontal well technology along with multi-
stage fracking to deliver a commercial production pilot. The first well has been successfully drilled and
fracture stimulated. Success in this program will be directly applicable to Bass’ commercialisation efforts.
Triassic Gas Study/Kiwi 1 Field Development (Bass 100%)
On 1 December Bass released to the ASX an update on the findings of the study to date.1
The team has
identified at least two additional gas prospects south of the Kiwi gas field that enhance the Kiwi South
stratigraphic trapping potential of the play.
In addition, there is a growing body of evidence that is suggesting that there is a new source for the
hydrocarbons discovered at Kiwi and adjacent fields. These hydrocarbons appear to have been generated
from carbonaceous Triassic aged sediments in the Arrabury Trough.2
The study continues and will include the reprocessing of the Dundinna 3D seismic survey to improve the
imaging of the target hydrocarbon reservoirs.
Bass continues to pursue funding options, including a farm down, for the Kiwi gas field development.
Figure 2: Map of Bass’ Kiwi Gas Field – Northern Cooper Basin Triassic Gas and Oil Play
1
Triassic gas study identifies further potential in Kiwi area – ASX Release 1 December 2025
2
A new Triassic source rock in the Cooper Basin, Australia? – Sharon Tiainen, South Australian Department for Energy
and Mining – First published AEG Conference Perth 8–11 September 2025
4
Indonesian Operations
Production from the Company’s Tangai-Sukananti Oil fields in Indonesia averaged 151 bopd (Bass share) in
December down 8% on November due to minor downtime and natural field decline. Bass’ share of field
production for the month was 4,690 barrels of oil with 4,732 barrels of oil sold. The average monthly oil price
for December was US$60.05 per barrel.
Development
All materials required for the drilling of the Bunian 6 oil development well have been delivered to site. The
team is currently evaluating tenders for drilling services. The Company will advise the timing of drilling when
a rig has been secured.
Figure 3: Bunian and Tangai Fields Location map
This announcement has been authorised for release by the Board of Directors of Bass Oil Limited.
For further information please contact:
Tino Guglielmo
Managing Director
Bass Oil Limited
Ph: +61 3 9927 3000
Email: tino.guglielmo@bassoil.com.au
Share your feedback
Discover