Operations Update - August 2025
Released
Released
Announcement PDF
ASX Announcement
Release date: 19 September 2025
Operations Update – August
Bass Oil Limited (ASX:BAS) is an Australian-listed oil producer that holds a majority interest in eight permits in the Cooper Basin including the 100%
owned Worrior and Padulla oil fields and a 55% interest in a South Sumatra Basin KSO. The Company is debt free and committed to creating value
by leveraging the competitive strengths of its team, operating capability, reputation, and relationships in both Australia and Indonesia.
Highlights
• Total sales revenue for August was A$615,721 net to Bass (USD$402,559) up 20% on July
• Daily oil production for the group averaged 228 bopd for the month, up 3.5% with total
monthly production of 7,062 barrels
• Total Cooper Basin monthly production was 3,050 barrels with 2,635 barrels sold at an
average oil price of A$104.45 per barrel
• Total Indonesian oil production was 4,012 barrels net to Bass with 4,028 barrels sold at an
average oil price of US$64.27 per barrel
• Production enhancement program commenced to increase Indonesian oil production
• Vanessa acquisition - regulatory approval progressing
• Bass preparing R&D claim for work to commercialise gas from the deep coals
Monthly Production and Sales:
Bass Oil Monthly Production (kbbl)
12
Production (kbbl)
10
8
3.01
2.93
6
2.87
3.44
4.20
4.21
3.66
2.97
2.86
2.62
2.97
3.00
2.72
3.05
3.73
4.01
4.15
4.21
4.22
4.10
4.01
4
6.72
2
5.22
3.98
0
Indonesian Production
Bass Oil Limited
ACN: 008 694 817
Level 5, 11-19 Bank Pl.,
Melbourne 3000
Victoria, Australia
Cooper Basin Production
T + 61 3 9927 3000
F + 61 3 9614 6533
admin@bassoil.com.au
www.bassoil.com.au
Daily oil production for the group averaged 228 bopd (Bass share) in August, up 3.5%. Monthly production
totaled 7,062 barrels (Bass share) with monthly sales of 6,663 barrels. Total sales revenue for August was
A$615,721 (or US$402,559) net to Bass. See below for further information.
Cooper Basin Operations
Production from the Company’s 100% owned Worrior and Padulla oilfields was 3,050 barrels for the month
of August, averaging 98 bopd up 12% on July. Oil sales totaled 2,635 barrels for the month, up 9% over July.
The Company achieved an average oil sales price of A$104.45 per barrel.
Production Operations
Both the Worrior and Padulla facilities recorded uptimes of 99% and 100% for August respectively.
Gas Appraisal
Vanessa Gas Field (Bass acquiring 100%)
The Company has commenced discussions with gas buyers interested in production from the re-start of the
Vanessa field. Bass is also progressing the relevant regulatory approvals for the transaction.
The Vanessa gas field acquisition (Figure 1) includes a gas processing facility and a 5-kilometre pipeline
connecting to the Cooper Basin gas transmission network. Detailed planning for the certification and
recommissioning of the Vanessa well, facilities and pipeline has commenced. The Vanessa acquisition is
important to the Company as it provides the opportunity for:
•
First gas sales - The recertification and recommissioning the Vanessa gas production facility and
pipeline would enable the Company’s first gas sales into the east coast gas market.
•
Reserve growth - by proving up significant untested conventional and tight gas potential in both the
Toolachee and Patchawarra formations that can be accessed from the well by fracture stimulation.
•
The advancement of activities to commercialise the deep coals - The Vanessa well penetrated the
entire Permian sequence of sediments, including the deep coals, at a location ideally situated to test
the commercialisation potential of the large deep coal resource contained in PEL 182 without
incurring the significant cost of drilling a dedicated well.
Figure 1: Map of Bass permit PEL 182 displaying Vanessa gas field
2
PEL 182 Deep Coal Commercialisation Study – Phase 2 (Bass 100%)
Bass and SLB have finalised the scope of phase 2 of the study which SLB will lead. In phase 1 the
geomechanical model built by SLB used the Vanessa 1 well as the ‘type well’ for the study. The study will
focus on well and fracture stimulation design for economic exploitation of this significant resource.
The Santos led Cooper Basin JV is focusing its efforts to commercialize this resource in 2025. Santos is
planning to drill two wells in this 12-month period to trial the use of high angle/horizontal well technology
along with multi-stage fracking to deliver a commercial production pilot. The first of these wells will spud
early next quarter. The well is scheduled for completion and fracture stimulation before year end. Success
from this program will be directly applicable to Bass’ commercialisation efforts.
Kiwi 1 Field Development (Bass 100%)
Bass is pursuing various funding options, including farm down, for the Kiwi gas field development. The
Company has also commenced the mapping phase of a study aimed at identifying follow-up opportunities to
the Kiwi gas discovery. The next phase of the study includes the reprocessing of the Dundinna 3D seismic
survey to improve the imaging of the target hydrocarbon reservoirs.
Figure 2: Map of Bass’ Kiwi Gas Field – Northern Cooper Basin Triassic Gas and Oil Play
Indonesian Operations
Production from the Company’s Tangai-Sukananti Oil fields in Indonesia averaged 129 bopd (Bass share) in
August. Bass’ share of field production for the month was 4,012 barrels of oil with 4,028 barrels of oil sold.
The average monthly oil price for August was US$64.27 per barrel.
3
Production Enhancement
Bass’ Indonesian team has commenced a production enhancement program aimed at achieving a material
increase in oil production from both the Bunian and Tangai fields. A workover rig has been mobilised to the
field and commenced operations late in the month.
The program consists of three workovers. Operations on the first well, Bunian 5, are complete where the rig
cleaned out sand build up in the wellbore and added additional perforations aimed at increasing its
productivity. The well will return to production shortly.
The second well in the program is Bunian 4, where the productive potential of an additional oil zone will be
tested. Finally, the rig will perform a pump repair on Tangai 5. Results will be reported when they become
available.
Development
The final materials required for the drilling of the Bunian 6 oil development well are due for delivery to site
shortly. Pertamina has advised that there is no slot available on their drilling program to allocate for the
drilling of Bunian 6. Bass has issued a tender for drilling services along with another operator in the area. The
Company will advise the timing of drilling when a rig has been secured.
Figure 3: Bunian and Tangai Fields Location map
Corporate
The Company is preparing a Research & Development claim for work carried out in FY24 to commercialise
the significant gas resource known to be contained in the deep coals within the Bass’ 100% owned PEL 182. If
successful, the Company will receive a 43.5% cash rebate of all qualifying expenditure.
This announcement has been authorised for release by the Board of Directors of Bass Oil Limited.
For further information please contact:
Tino Guglielmo
Managing Director
Bass Oil Limited
Ph: +61 3 9927 3000
Email: tino.guglielmo@bassoil.com.au
4