Amendment to Announcement AGM Presentation
Released
Released
Announcement PDF
ASX Announcement
Release date: 15 May 2025
Amendment to ASX Announcement
Bass Oil Limited (ASX:BAS) is an Australian-listed oil producer that holds a majority interest in eight permits in the Cooper Basin including the
100% owned Worrior and Padulla oil fields and a 55% interest in a South Sumatra Basin KSO. The Company is debt free and committed to
creating value by leveraging the competitive strengths of its team, operating capability, reputation, and relationships in both Australia and
Indonesia.
Bass Oil Limited (ASX:BAS) (“Bass” or the “Company”) wishes to advise of amendments to the
announcement titled “2025 AGM Presentation” released on 15 May 2025, which amendments are included
in the attached revised announcement.
The following amendments have been made:
•
Inclusion of a Competent Person statement; and
•
Inclusion of a cautionary statement for the prospective resources.
This announcement has been approved for release by the Board of Bass Oil Limited.
For further information please contact:
Tino Guglielmo
Managing Director
Bass Oil Limited
Ph: +61 3 9927 3000
Email: tino.guglielmo@bassoil.com.au
Bass Oil Limited
ACN: 008 694 817
Level 5, 11-19 Bank Pl.,
Melbourne 3000
Victoria, Australia
T + 61 3 9927 3000
F + 61 3 9614 6533
admin@bassoil.com.au
www.bassoil.com.au
AGM Presentation
May 2025
BASS OIL LIMITED
AN EMERGING AUSTRALIAN GAS PRODUCER
ASX:BAS
DISCLAIMER
Important Notice
This document is confidential and may not be reproduced, redistributed or passed on, directly or indirectly. This document is neither a prospectus nor an offer to subscribe for Shares. The purpose of this presentation is to provide
general information about Bass Oil Ltd (“Bass” or the “Company”). This presentation is current as at 15 May 2025 (unless otherwise stated herein) and the information contained in it is in a summary form and does not purport to be
complete. The information in this presentation remains subject to change without notice. It is not recommended that any person makes any investment decision in relation to the Company based solely on this presentation.
This presentation does not necessarily contain all information which maybe material to the making of a decision in relation to the Company. Any investor should make their own independent assessment and determination as to
the Company’s prospects prior to making any investment decision and should not rely on the information in this presentation for that purpose.
This presentation does not involve or imply a recommendation or a statement of opinion in respect of whether to buy, sell or hold securities in the Company. The securities issued by the Company are considered speculative and there
is no guarantee that they will make a return on the capital invested, that dividends will be paid on the shares or that there will be an increase in the value of the shares in the future. This presentation is not, and does not constitute, an
offer to sell, or the solicitation, invitation or recommendation of an offer to buy, any securities in any jurisdiction, including the United States, and neither this presentation, nor any of the information contained herein, shall form
the basis of any contract or commitment. The information in the presentation does not constitute an advertisement for an offer or proposed offer of securities and does not constitute a representation that an offering will
occur. No person is authorised to give information or make any representation that an offering will occur.
Any securities of Bass have not been, and will not be, registered under the U.S. Securities Act or the securities laws of any state or other jurisdiction of the United States and, if there is an offer of securities, may not be offered or sold in
the United States except in transactions exempt from or not subject to, the registration requirements of the U.S. Securities Act and any other applicable securities laws.
This presentation is presented for informational purposes only. It is not intended to be, and is not, a prospectus, product disclosure statement, offering memorandum or private placement memorandum for the purpose of Chapter 6D of the
Corporations Act 2001.
Except for statutory liability which cannot be excluded, the Company, its officers, employees and advisers expressly disclaim any responsibility for, and make no representations or warranty for, the accuracy or completeness of the
material contained in this presentation and exclude all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error
or omission there from. The Company accepts no responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information made available to a person nor any
obligation to furnish the person with any further information.
This presentation contains “forward-looking statements” and comments about future events, including statements about Bass’s expectations about the performance of its business. Forward-looking statements may include
words such as “anticipate”, “believe”, “expect”, “project”, “forecast”, “estimate”, “out-look”, “upside”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”, and other similar expressions. Indications of, and guidance on, future earnings
and financial position and performance are also forward-looking statements. Forward-looking statements, opinions and estimates provided in this presentation are based on assumptions and contingencies which are subject to change
without notice. Forward-looking statements including projections, guidance on future earnings and estimates are provided as a general guide only and should not be relied upon as an indication, prediction or guarantee of future
performance. Actual results may differ materially from those expressed or implied in such statements and these differences maybe material. The forward-looking statements in this presentation involve known and unknown risks
and other factors, many of which are beyond the control of, or unknown to, Bass, its directors, officers and employees, and may involve significant elements of subjective judgement and assumptions as to future events which may or
may not be correct.
Such forward looking statements are based on information available to Bass as at the date of this presentation. Recipients are cautioned not to place undue reliance on forward looking statements and except as required by law or
regulation, Bass assumes no liability to update these forward-looking statements. Such statements speak only as of the date hereof, and Bass has no obligation to update or revise any such statements to reflect any change in
events, conditions or circumstances on which any such statement is based.
No representation or warranty, express or implied, is made by the Company that the matters stated in this presentation will be achieved or prove to be correct. Recipients of this presentation must make their own investigations and
inquiries regarding all assumptions, risks, uncertainties and contingencies which may affect the future operations of the Company or the Company’s securities.
The Company does not purport to give financial or investment advice. No account has been taken of the objectives, financial situation or needs of any recipient of this document. Recipients of this document should carefully
consider whether the securities issued by the Company are an appropriate investment for them in light of their personal circumstances, including their financial and taxation position.
Resources and Reserves Statement
Cautionary Statement
The estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both a risk of discovery and a risk of
development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially recoverable hydrocarbons.
Qualified Petroleum Reserves and Resources Evaluator Statement
The information contained in this report regarding the Bass Oil Limited reserves and contingent resources is based on and fairly represents information and supporting documentation reviewed by Mr Giustino Guglielmo who is an
employee of Bass Oil Limited and holds a Bachelor of Engineering (Mech). He is a member of the Society of Petroleum Engineers (SPE) and a Fellow of the Institution of Engineers Australia (FIEAust) and as such is qualified in
accordance with ASX listing rule 5.4.1 and has consented to the inclusion of this information in the form and context in which it appears.
AGM Presentation – May 2025
2
COMPANY OVERVIEW
Positioned for growth on a gas-led expansion and value creation
➢
Bass is an ASX listed energy company with
oil production in the Cooper Basin and
Indonesia.
➢
Bass is debt-free, with cashflow, and led by
an experienced team with proven operational
capability.
➢
The Company has built a portfolio of reliable
cash generating assets balanced by assets
with significant growth potential.
➢
Bass’ focus is unlocking value from multiple
emerging conventional and unconventional
gas plays in the Cooper Basin
➢
The Vanessa Gas field acquisition;
➢
Provides a low-cost and fast-track entry
path into the East Coast gas market
➢
whilst accelerating the evaluation of the
potential ‘company making’ deep coal
gas resource in PEL 182.
AGM Presentation – May 2025
Figure 1: Gas flare from Kiwi-1 wellsite at 1.7 mmcfd
3
BASS OIL | CORPORATE SNAPSHOT
Company is committed to becoming a mid-tier oil and gas producer
Snapshot
Ownership Summary
ASX Code
Directors
and Staff
9%
BAS
Shares (Ordinary)
Share Price 12-Month Chart
290,475,000
Share Price
$0.040
Institutional
and
Corporate
27%
0.140
7.00
0.120
6.00
0.100
5.00
0.080
4.00
Market Capitalisation
A$11.6m
Enterprise Value
A$10.6m
Net Cash (31 Dec 2024)
A$0.9m
0.060
3.00
Total No. Shareholders
1886
0.040
2.00
0.020
1.00
Retail
64%
Board
0.000
May-24
Chairman, Nonexecutive Director
Hector M Gordon
Managing Director
Tino Guglielmo
AGM Presentation – May 2025
Non-executive
Director Laura
Reed
0.00
Aug-24
Nov-24
Daily Volume
Feb-25
Close Price
Non-executive
Director Mark
Lindh
4
BASS CURRENTLY DEEPLY UNDERVALUED
Current valuation of resources exceeds the company's market capitalisation
➢
The market not recognising full value of
Bass’ 2P reserves, leading to an
undervaluation.
➢
Indicative value of Bass’ current 2P
reserve exceeds the market cap by
~150%
➢
This value comes with a bonus — no
value attributed to PEL 182 or Kiwi assets.
➢
Bass’ share price has a history of
responding well to significant news
events.
➢
Bass’ planned 2025 work program and
planned activity by neighboring operators
should provide a catalyst for a re-rating.
Figure 3: Map of Cooper basin gas field and Bass Oil permits
1Please refer to ASX Announcements, “2024 Reserves and Contingent Resources”, released 28 March 25
AGM Presentation – May 2025
5
VANESSA ACQUISITION
Strategic acquisition unlocking near-term gas production and long-term growth potential.
➢
Immediate access to infrastructure,
including a production well, processing
equipment, and pipeline connection to the
Cooper Basin network.
➢
Creates an opportunity to accelerate gas
sales into the East Coast market, bringing
forward revenue generation.
➢
Low acquisition cost structure, with vendor
assisting with the the rehabilitation liability.
➢
Significant upside potential from untested
conventional and tight gas targets in
multiple formations in Vanessa.
➢
Accelerating the evaluation of the
‘company making’ deep coal gas potential
in Bass’ PEL 182.
Figure 3: Total net Permian coal thickness in the Patchawarra Trough.
AGM Presentation – May 2025
6
CAPITAL RAISING
Deploying capital to accelerate growth, enhance production, and unlock long-term value
➢
~A$1.3 million – Recommission Vanessa
gas facility and lodge rehabilitation bond
to enable first East Coast gas sales.
➢
~A$1.0 million – Drill Bunian 6 to increase
Indonesian oil production from ~135 bopd
to ~435 bopd (Bass share).
➢
~A$0.1 million – Complete FEED study at
Kiwi to support future gas market
connection.
➢
~A$0.12 million – Advance evaluation of
the Triassic gas play in the Northern
Cooper Basin.
➢
Figure 3: Gas/liquids separator in place at Vanessa facility
~A$0.10 million – Conduct Phase 2 of the
Deep Coal Feasibility Study with SLB.
Refer to the ASX Announcement “Bass to Acquire Vanessa Gas Field and Launches
Capital Raise” and “Non-Renounceable Rights Issue” both dated 14 May 2025
AGM Presentation – May 2025
7
DEEP COAL GAS RESOURCE PLAY
Phase 2 SLB study underway on 100% owned ‘Company making’ PEL-182
➢
PEL 182 contains “best estimate” of 21
TCF of gas in place, along with an
accompanying 845 million barrels of
condensate in place1,2
➢
Recent studies indicate that the
Patchawarra trough may be Australia’s
next gas resource play similar to the
Beetaloo basin and Taroom trough.
➢
The Moolion East deep coal prospect,
also intersected by Vanessa, has an
assessed prospective resources (2U) of
568 BCF of gas with 22.7 million barrels
of condensate.
➢
Phase 2 of the study will determine
preliminary well and frac designs with
economics to exploit this potentially
large resource.
Figure 4: Total net Permian coal thickness in the Patchawarra Trough
Please refer to ASX Announcement, 1“Significant Gas Resource Identified in PEL 182” and 2“PEL182 Geomechanical Study Results” released 16 November 2022 and 16 September 2024 respectively for
further information and page 2 - Cautionary Statement
AGM Presentation – May 2025
8
KIWI GAS DISCOVERY | MILLION BARREL OPPORTUNITY
Bass’ 100% owned Kiwi gas field – surpasses economic threshold with high condensate yield
➢
Kiwi production test recorded rates of
4.1 million cu-ft/day and 988 barrels of
condensate per day (limited by surface
equipment)
➢
A high condensate yield has increased
the best estimate of Contingent
Resources (2C) to 1.02 million boe.
➢
Screening economics indicated an
ATAX NPV of over $20 million
➢
A Kiwi field development approval will
more than double booked reserves.
➢
Financing options under review
including farming down from 100%
ownership.
Figure 5: Ex PEL 90K block location map
Please refer to ASX Announcements, “2024 Reserves and Contingent Resources” , “Kiwi 1 Extended Production Test (EPT) Update” and “Kiwi-1 Demonstrates Strong Initial Results from EPT”,
released 28 March 2025, 26 September 2023 and 27 August 2024 respectively for further information
AGM Presentation – May 2025
9
OUTLOOK
Building a profitable portfolio of high potential oil and gas assets
➢
Vanessa gas field acquisition positions Bass
for first gas sales into the East Coast
market earlier that previously planned.
➢
In combination with the Phase 2 deep coal
gas commercialisation study in PEL 182,
Vanessa provides a fast-track development
pathway for the success case.
➢
Kiwi gas field progressing toward FID in
2025, with FEED study and commercial
negotiations ongoing.
➢
Multiple funding options, including farm
down, under review to accelerate
development of high-impact Cooper Basin
gas assets.
Figure 8: Gas flare from Kiwi-1 wellsite at 1.7 mmcfd
AGM Presentation – May 2025
10
Tino Guglielmo – Managing Director
tino.guglielmo@bassoil.com.au
+61 3 9927 3000
www.bassoil.com.au
EVALUATING LARGER TRIASSIC GAS PLAY
Study to quantify the significant potential in the Company’s Northern Cooper Basin tenements
➢
Bass has identified significant potential
in Triassic aged sediments within its
majority owned tenements.
➢
Bass will undertake a study to evaluate
its extent through further exploration
potential within the Arrabury Trough.
➢
Reprocessing of 3D seismic data to
identify additional drilling opportunities.
➢
Ongoing FEED study and commercial
negotiations to advance to a Final
Investment Decision (FID) in 2025.
➢
Bass is strategically positioned to
capitalize on emerging opportunities,
with a clear pathway to development
and long-term value creation.
Figure 7: Economic screening results from Kiwi-1
1Please refer to ASX Announcements, “Kiwi-1 Test Results Demonstrate Field Commerciality and Estimate of Contingent Resource Updated”, released 8 November 24
AGM Presentation – May 2025
12
INDONESIA – BUNIAN 6 WELL
Bunian 6 development well to unlock increased revenue from operations
➢
Targeted capital deployment to drill the
Bunian 6 well in the Tangai-Sukananti oil
field, South Sumatra Basin.
➢
Targeted production increase from ~135
bopd to ~435 bopd (Bass share).
➢
Investment anticipated to be recovered
within six months through oil sales.
➢
Enhances cash flow and production base
from existing Indonesian operations.
➢
Drilling results will help determine the
presence of a westerly extension of the
Bunian field for future drilling potential.
AGM Presentation – May 2025
Figure 3: Tangai-Sukananti KSO Location map
13
RIGHTS ISSUE TIMETABLE
Event
Date
Rights Issue announcement date and lodgement of Prospectus with ASIC and ASX
14 May 2025
Existing Shares quoted ex-rights
19 May 2025
Record Date to determine Entitlements under the Rights Issue
7:00pm (AEST) 20 May 2025
Prospectus with Entitlement and Acceptance Form despatched to Eligible Shareholders
23 May 2025
Acceptances open
23 May 2025
Closing Date for acceptances
13 June 2025
New Securities are quoted for ASX trading on a deferred settlement basis
16 June 2025
Company notifies ASX of under subscriptions
18 June 2025
Issue of Rights Issue Shares and Rights Issue Options
19 June 2025
Despatch of holding statements
20 June 2025
AGM Presentation – May 2025
14
Share your feedback
Discover