Bunian 6 Weekly Progress Report
Summary
Bunian 6 – Present depth is 1573 metres - at 0600 hours 21 August, the rig was drilling ahead in the production hole towards the primary targets
During the week, the rig’s top drive was replaced and drilling of the final section of the well commenced
This coming week the plan is drilling the 8-1/2” production hole section of the well to a TD of ~1820 metres
The well, once completed, is expected to boost Indonesian oil production from 250 bopd to 750 bopd (100% share) coming online in late August - Bass is Operator and 55% interest holder in the permit